Blaenau Ffestiniog
BFFWalesManaged by TfW Rail
How this station is performing
Blaenau Ffestiniog had 3,735 scheduled stops to Period 7 of 2026-27, about 10 a day. 90.3% of recorded arrivals were within three minutes of the timetable and 4.3% of scheduled stops were cancelled.
Blaenau Ffestiniog opened on 30 May 1868 and closed to passengers on 4 January 1960. It reopened on 21 March 1982, 44 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Penrhyndeudraeth is the oldest (1867) and Llandecwyn the newest (1935), with Blaenau Ffestiniog in between.
The nearest stations to Blaenau Ffestiniog are Roman Bridge (5.6 km north), Dolwyddelan (7.3 km north-east), Pont-y-pant (9.3 km north-east), Penrhyndeudraeth (11.2 km south-west) and Llandecwyn (11.4 km south-west). 3 stations lie within 10 km in all.
Blaenau Ffestiniog takes its name from a town called Blaenau Ffestiniog, home to about 4,875 people, and the station stands 0.1 km from its centre.
Blaenau Ffestiniog improved sharply over the past year. In the latest 13 periods 90.3% of stops came within three minutes of the timetable, up 7.8 percentage points from 82.5% in the 13 before. Cancellations rose to 4.3% of scheduled stops from 2.4%, which is 1.9 percentage points more.
Compared with 3 stations of a similar size in Wales, Blaenau Ffestiniog is the most punctual, at 90.3%. The comparison group includes Llanrwst (81.8%), Betws-y-coed (81.0%) and Llandrindod (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 3,735 | 90.3% | 4.3% |
Operators with their own page for this station are linked to it.
Late train at Blaenau Ffestiniog? Delay Repay
These operators call at Blaenau Ffestiniog and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 320 | 94.4% | 0.3% |
| Period 6 of 2026-27 | 320 | 92.3% | 3.1% |
| Period 5 of 2026-27 | 259 | 89.4% | 1.9% |
| Period 4 of 2026-27 | 270 | 91.8% | 9.6% |
| Period 3 of 2026-27 | 281 | 94.2% | 1.4% |
| Period 2 of 2026-27 | 318 | 91.0% | 1.9% |
| Period 1 of 2026-27 | 365 | 88.6% | 1.6% |
| Period 13 of 2025-26 | 348 | 93.2% | 2.6% |
| Period 12 of 2025-26 | 320 | 92.6% | 2.5% |
| Period 11 of 2025-26 | 296 | 91.3% | 6.8% |
| Period 10 of 2025-26 | 227 | 87.3% | 9.7% |
| Period 9 of 2025-26 | 279 | 80.1% | 8.2% |
| Period 8 of 2025-26 | 132 | 77.7% | 15.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llanrwst | 3,727 | 81.8% | 3.9% |
| Betws-y-coed | 3,726 | 81.0% | 4.1% |
| Llandrindod | 3,711 | 85.0% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out