Northern at Blackrod
How this operator is doing here
Northern had 16,336 scheduled stops at Blackrod in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 56.3% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
Northern trains at Blackrod also serve Horwich Parkway (2.5 km south-east, 60.0% on time, 4.8% cancelled), Adlington (Lancashire) (3.3 km north-west, 56.3% on time, 5.1% cancelled), Westhoughton (5.0 km south-east, 74.4% on time, 3.6% cancelled), Lostock (5.4 km south-east, 58.4% on time, 4.9% cancelled), Hindley (5.5 km south, 80.6% on time, 3.1% cancelled) and Ince (Manchester) (6.5 km south-west, 77.2% on time, 3.0% cancelled), which are the stations on its network closest to Blackrod.
Within 30 km of here, Northern runs best at Belle Vue, 29.5 km south-east (90.9%), and worst at Moses Gate, 11.8 km east (52.6%).
The busiest Northern station within 30 km of Blackrod is Manchester Piccadilly, 25.8 km south-east, with about 508 scheduled stops a day.
Of the 1 operators with enough records at Blackrod, Northern is the most punctual, at 56.3%.
Northern at Blackrod has slipped a little, from 60.3% within three minutes in the previous 13 periods to 56.3% in the latest 13, a fall of 4.0 percentage points. Cancellations fell to 5.0% of scheduled stops from 6.7%, which is 1.7 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,240 | 57.5% | 4.6% |
| Period 6 of 2026-27 | 1,240 | 59.0% | 3.7% |
| Period 5 of 2026-27 | 1,244 | 59.1% | 6.2% |
| Period 4 of 2026-27 | 1,243 | 57.2% | 5.2% |
| Period 3 of 2026-27 | 1,237 | 56.1% | 6.4% |
| Period 2 of 2026-27 | 1,244 | 62.2% | 3.9% |
| Period 1 of 2026-27 | 1,430 | 57.4% | 4.3% |
| Period 13 of 2025-26 | 1,368 | 57.5% | 8.8% |
| Period 12 of 2025-26 | 1,247 | 60.1% | 2.8% |
| Period 11 of 2025-26 | 1,230 | 59.9% | 2.7% |
| Period 10 of 2025-26 | 1,125 | 54.1% | 8.4% |
| Period 9 of 2025-26 | 1,248 | 41.5% | 5.4% |
| Period 8 of 2025-26 | 1,240 | 49.9% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Blackrod
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out