Northern at Blackburn
How this operator is doing here
Northern had 58,509 scheduled stops at Blackburn in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 76.0% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
Northern trains at Blackburn also serve Mill Hill (Lancs) (1.9 km south-west, 84.9% on time, 3.0% cancelled), Cherry Tree (3.0 km south-west, 84.2% on time, 3.0% cancelled), Ramsgreave and Wilpshire (3.7 km north, 79.2% on time, 4.0% cancelled), Rishton (4.3 km north-east, 82.1% on time, 3.4% cancelled), Pleasington (4.6 km west, 85.2% on time, 3.0% cancelled) and Darwen (5.5 km south, 70.3% on time, 3.2% cancelled), which are the stations on its network closest to Blackburn.
Within 30 km of here, Northern runs best at Rufford, 25.0 km south-west (89.5%), and worst at Moses Gate, 21.8 km south (52.6%).
The busiest Northern station within 30 km of Blackburn is Preston (Lancs), 15.0 km west, with about 260 scheduled stops a day.
Of the 1 operators with enough records at Blackburn, Northern is the most punctual, at 76.0%.
Over three full railway years Northern at Blackburn has got worse each time, from 82.4% within three minutes in 2023-24 to 79.9% in 2024-25 and 76.8% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,555 | 72.8% | 2.7% |
| Period 6 of 2026-27 | 4,532 | 80.0% | 2.1% |
| Period 5 of 2026-27 | 4,446 | 78.3% | 4.0% |
| Period 4 of 2026-27 | 4,392 | 76.6% | 4.7% |
| Period 3 of 2026-27 | 4,264 | 76.5% | 3.5% |
| Period 2 of 2026-27 | 4,554 | 74.6% | 4.3% |
| Period 1 of 2026-27 | 5,262 | 80.0% | 3.3% |
| Period 13 of 2025-26 | 4,975 | 79.5% | 2.7% |
| Period 12 of 2025-26 | 4,549 | 76.6% | 1.9% |
| Period 11 of 2025-26 | 4,552 | 78.3% | 2.1% |
| Period 10 of 2025-26 | 4,156 | 77.8% | 5.5% |
| Period 9 of 2025-26 | 4,228 | 64.7% | 4.0% |
| Period 8 of 2025-26 | 4,044 | 70.8% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Blackburn
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out