Transport for Wales at Bangor (Gwynedd)
All trains at Bangor (Gwynedd)Transport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 15,187 scheduled stops at Bangor (Gwynedd) in the 13 periods to Period 7 of 2026-27, 76% of the station's total. 77.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Transport for Wales trains at Bangor (Gwynedd) also serve Llanfairpwll (4.9 km west, 77.5% on time, 2.5% cancelled), Llanfairfechan (10.8 km east, 77.2% on time, 1.6% cancelled), Penmaenmawr (15.1 km east, 75.0% on time, 1.6% cancelled), Bodorgan (18.8 km west, 74.6% on time, 2.5% cancelled), Tal-y-cafn (21.1 km east, 77.4% on time, 2.6% cancelled) and Dolgarrog (21.2 km east, – on time, 3.2% cancelled), which are the stations on its network closest to Bangor (Gwynedd).
Within 30 km of here, Transport for Wales runs best at Blaenau Ffestiniog, 28.6 km south-east (90.3%), and worst at Bodorgan, 18.8 km west (74.6%).
The busiest Transport for Wales station within 30 km of Bangor (Gwynedd) is Llandudno Junction, 22.8 km east, with about 105 scheduled stops a day.
Of the 2 operators with enough records at Bangor (Gwynedd), Transport for Wales is the most punctual, at 77.3%.
Over three full railway years Transport for Wales at Bangor (Gwynedd) has improved each time, from 73.5% within three minutes in 2023-24 to 76.1% in 2024-25 and 79.7% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,373 | 76.7% | 1.8% |
| Period 6 of 2026-27 | 1,380 | 69.2% | 2.6% |
| Period 5 of 2026-27 | 1,312 | 73.4% | 2.2% |
| Period 4 of 2026-27 | 1,373 | 74.9% | 2.5% |
| Period 3 of 2026-27 | 1,383 | 75.1% | 2.6% |
| Period 2 of 2026-27 | 1,192 | 75.4% | 1.6% |
| Period 1 of 2026-27 | 1,160 | 83.1% | 1.2% |
| Period 13 of 2025-26 | 1,114 | 86.8% | 1.5% |
| Period 12 of 2025-26 | 1,011 | 85.2% | 1.7% |
| Period 11 of 2025-26 | 994 | 83.5% | 2.1% |
| Period 10 of 2025-26 | 899 | 82.1% | 2.2% |
| Period 9 of 2025-26 | 984 | 72.3% | 2.7% |
| Period 8 of 2025-26 | 1,012 | 72.0% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bangor (Gwynedd)
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 4,775 | 74.0% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out