Avoncliff
AVFSouth WestManaged by Great Western Railway
How this station is performing
Avoncliff has usable figures for 8 of the last 13 four-week periods to Period 7 of 2026-27, covering 13,745 scheduled stops, about 38 a day. In those periods 77.6% of stops arrived within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Avoncliff opened on 9 July 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bath Spa is the oldest (1840) and Oldfield Park the newest (1929), with Avoncliff in between.
The nearest stations to Avoncliff are Freshford (1.4 km west), Bradford-on-Avon (2.1 km east), Trowbridge (5.1 km south-east), Bath Spa (6.7 km north-west) and Oldfield Park (8.2 km north-west). 6 stations lie within 10 km in all. At 77.6%, Avoncliff is more punctual than every one of them; the best of the five, Freshford, manages 76.7%.
Avoncliff takes its name from a Village called Avoncliff, and the station stands 0.1 km from its centre.
For Avoncliff, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 68.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 86.4%, which is 17.5 percentage points higher. Cancellations peaked at 13.2% of scheduled stops in Period 9 of 2024-25, against 4.9% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 13,745 | 77.6% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Avoncliff? Delay Repay
These operators call at Avoncliff and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,062 | 75.5% | 4.8% |
| Period 6 of 2026-27 | 1,066 | 78.9% | 2.6% |
| Period 5 of 2026-27 | 1,041 | 74.7% | 4.8% |
| Period 4 of 2026-27 | 1,058 | 68.9% | 6.8% |
| Period 3 of 2026-27 | 980 | 81.3% | 9.6% |
| Period 2 of 2026-27 | 1,006 | 72.5% | 8.3% |
| Period 1 of 2026-27 | 1,122 | 86.4% | 2.0% |
| Period 13 of 2025-26 | 1,171 | 81.9% | 4.5% |
| Period 12 of 2025-26 | 1,062 | – | 2.0% |
| Period 11 of 2025-26 | 1,059 | – | 3.8% |
| Period 10 of 2025-26 | 966 | – | 4.3% |
| Period 9 of 2025-26 | 1,076 | – | 6.9% |
| Period 8 of 2025-26 | 1,076 | – | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out