Ashley Down
ASDSouth WestManaged by Great Western Railway
How this station is performing
Ashley Down had 9,462 scheduled stops to Period 7 of 2026-27, about 26 a day. 84.7% of recorded arrivals were within three minutes of the timetable and 7.9% of scheduled stops were cancelled.
Ashley Down opened on 13 June 1864 and closed to passengers on 23 November 1964. It reopened on 28 September 2024, 2 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Stapleton Road is the oldest (1863) and Redland the newest (1897), with Ashley Down in between.
The nearest stations to Ashley Down are Montpelier (1.4 km south-west), Stapleton Road (1.4 km south-east), Redland (1.9 km south-west), Lawrence Hill (2.4 km south) and Clifton Down (2.9 km south-west). 18 stations lie within 10 km in all. At 84.7%, Ashley Down is more punctual than every one of them; the best of the five, Lawrence Hill, manages 82.8%.
Ashley Down takes its name from a suburb called Ashley Down, and the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in South West, Ashley Down is the most punctual, at 84.7%. The comparison group includes Keyham (81.9%), Holton Heath (73.5%) and Dockyard (Devonport) (81.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 9,462 | 84.7% | 7.9% |
Operators with their own page for this station are linked to it.
Late train at Ashley Down? Delay Repay
These operators call at Ashley Down and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 732 | 81.4% | 9.2% |
| Period 6 of 2026-27 | 734 | 85.1% | 15.8% |
| Period 5 of 2026-27 | 556 | 78.1% | 13.1% |
| Period 4 of 2026-27 | 738 | 81.4% | 12.7% |
| Period 3 of 2026-27 | 663 | 86.5% | 12.8% |
| Period 2 of 2026-27 | 735 | 76.3% | 6.4% |
| Period 1 of 2026-27 | 850 | 89.7% | 2.6% |
| Period 13 of 2025-26 | 807 | 89.4% | 4.1% |
| Period 12 of 2025-26 | 738 | 91.1% | 3.0% |
| Period 11 of 2025-26 | 744 | 90.3% | 5.2% |
| Period 10 of 2025-26 | 685 | 78.8% | 4.8% |
| Period 9 of 2025-26 | 738 | 82.7% | 11.4% |
| Period 8 of 2025-26 | 742 | 86.4% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Keyham | 9,184 | 81.9% | 4.0% |
| Holton Heath | 9,973 | 73.5% | 4.5% |
| Dockyard (Devonport) | 8,958 | 81.5% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out