Northern at Ashburys
How this operator is doing here
Northern had 40,984 scheduled stops at Ashburys in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 90.3% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Northern trains at Ashburys also serve Ardwick (1.3 km west, – on time, – cancelled), Belle Vue (1.5 km south-east, 90.9% on time, 2.2% cancelled), Gorton (1.9 km east, 87.5% on time, 2.3% cancelled), Ryder Brow (2.2 km south-east, 92.5% on time, 2.3% cancelled), Manchester Piccadilly (2.4 km west, 75.9% on time, 2.7% cancelled) and Levenshulme (3.0 km south, 81.7% on time, 2.8% cancelled), which are the stations on its network closest to Ashburys.
Within 30 km of here, Northern runs best at Rose Hill Marple, 11.5 km south-east (93.3%), and worst at Moses Gate, 16.5 km north-west (52.6%).
The busiest Northern station within 30 km of Ashburys is Manchester Piccadilly, 2.4 km west, with about 508 scheduled stops a day.
Of the 1 operators with enough records at Ashburys, Northern is the most punctual, at 90.3%.
For Northern, Ashburys is the 28th best of 493 ranked stations. Its 90.3% here is 11.7 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Ashburys has improved each time, from 86.4% within three minutes in 2023-24 to 87.0% in 2024-25 and 89.8% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,264 | 91.2% | 1.5% |
| Period 6 of 2026-27 | 3,248 | 91.7% | 1.2% |
| Period 5 of 2026-27 | 2,930 | 90.1% | 1.0% |
| Period 4 of 2026-27 | 3,187 | 88.9% | 2.2% |
| Period 3 of 2026-27 | 2,939 | 92.2% | 0.9% |
| Period 2 of 2026-27 | 3,239 | 90.9% | 1.8% |
| Period 1 of 2026-27 | 3,758 | 92.4% | 4.3% |
| Period 13 of 2025-26 | 3,541 | 92.7% | 0.7% |
| Period 12 of 2025-26 | 2,271 | 93.9% | 1.7% |
| Period 11 of 2025-26 | 3,167 | 93.6% | 1.1% |
| Period 10 of 2025-26 | 2,950 | 90.5% | 4.1% |
| Period 9 of 2025-26 | 3,226 | 81.1% | 3.3% |
| Period 8 of 2025-26 | 3,264 | 85.4% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out