Appley Bridge
APBNorth WestManaged by Northern Trains
How this station is performing
Appley Bridge has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 20,449 scheduled stops, about 56 a day. In those periods 72.4% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Appley Bridge opened on 9 April 1855, 171 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Orrell is the oldest (1848) and Hoscar the newest (1870), with Appley Bridge in between.
The nearest stations to Appley Bridge are Gathurst (2.7 km south-east), Parbold (3.6 km west), Orrell (5.4 km south), Upholland (5.8 km south) and Hoscar (6.0 km west). 16 stations lie within 10 km in all. Of the five, Upholland is the most punctual at 87.4% and Gathurst the least at 66.1%, with Appley Bridge on 72.4%.
Appley Bridge takes its name from a Village called Appley Bridge, home to about 18,500 people, and the station stands 0.1 km from its centre.
Northern is the only operator serving Appley Bridge. Here it manages 72.4% within three minutes, 6.2 percentage points worse than its 78.6% across its whole network.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,449 | 72.4% | 4.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,596 | – | 2.6% |
| Period 6 of 2026-27 | 1,580 | 72.4% | 2.8% |
| Period 5 of 2026-27 | 1,243 | – | 7.6% |
| Period 4 of 2026-27 | 1,588 | – | 2.9% |
| Period 3 of 2026-27 | 1,437 | – | 2.7% |
| Period 2 of 2026-27 | 1,596 | – | 3.4% |
| Period 1 of 2026-27 | 1,852 | – | 2.3% |
| Period 13 of 2025-26 | 1,739 | – | 5.5% |
| Period 12 of 2025-26 | 1,596 | – | 5.3% |
| Period 11 of 2025-26 | 1,596 | – | 3.4% |
| Period 10 of 2025-26 | 1,457 | – | 6.3% |
| Period 9 of 2025-26 | 1,577 | – | 4.5% |
| Period 8 of 2025-26 | 1,592 | – | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out