Alsager
ASGNorth WestManaged by East Midlands Railway
How this station is performing
Alsager had 22,918 scheduled stops to Period 7 of 2026-27, about 63 a day. 73.1% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Alsager opened on 9 October 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Alsager is the newest; the oldest, Crewe, opened in 1837.
The nearest stations to Alsager are Kidsgrove (3.7 km east), Longport (7.9 km south-east), Crewe (9.0 km west), Sandbach (9.0 km north-west) and Congleton (10.1 km north-east). 4 stations lie within 10 km in all. Of the five, Sandbach is the most punctual at 82.0% and Longport the least at 64.6%, with Alsager on 73.1%.
Alsager takes its name from a town called Alsager, home to about 13,390 people, and the station stands 0.5 km from its centre.
2 operators call at Alsager: West Midlands Railway (68.3%, 53% of stops) and East Midlands Railway (78.5%, 47% of stops). The operator you travel with matters: East Midlands Railway reaches 78.5% within three minutes while West Midlands Railway manages 68.3%, a gap of 10.2 percentage points.
Compared with 3 stations of a similar size in North West, Alsager is the least punctual, at 73.1%. All of them are ahead, including Prescot (89.6%), Broadbottom (85.4%) and Flowery Field (87.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 12,126 | 68.3% | 4.1% |
| East Midlands Railway | 10,792 | 78.5% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Alsager? Delay Repay
These operators call at Alsager and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,760 | 71.3% | 1.6% |
| Period 6 of 2026-27 | 1,760 | 67.2% | 2.4% |
| Period 5 of 2026-27 | 1,759 | 68.0% | 3.9% |
| Period 4 of 2026-27 | 1,626 | 63.6% | 5.1% |
| Period 3 of 2026-27 | 1,754 | 70.4% | 4.3% |
| Period 2 of 2026-27 | 1,692 | 75.3% | 3.9% |
| Period 1 of 2026-27 | 2,025 | 82.2% | 1.8% |
| Period 13 of 2025-26 | 1,935 | 79.2% | 2.5% |
| Period 12 of 2025-26 | 1,760 | 75.0% | 1.3% |
| Period 11 of 2025-26 | 1,718 | 81.1% | 8.1% |
| Period 10 of 2025-26 | 1,609 | 74.9% | 3.7% |
| Period 9 of 2025-26 | 1,760 | 64.6% | 7.6% |
| Period 8 of 2025-26 | 1,760 | 75.2% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Prescot | 22,994 | 89.6% | 2.5% |
| Broadbottom | 23,022 | 85.4% | 2.1% |
| Flowery Field | 23,022 | 87.8% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out